首页建筑研究 专题列表

景观设计的原则

收录时间:2009-06-03 06:04 来源:建筑中文网  作者:逄娟  阅读:0次 评论:0我要评论

内容提示:Landscaping combines elements of art and science to create a functional, aesthetically pleasing extension of indoor living to the outdoors. One initial purpose of landscape design is to blend man's te

延伸阅读:原则 景观设计

    Landscaping combines elements of art and science to create a functional, aesthetically pleasing extension of indoor living to the outdoors. One initial purpose of landscape design is to blend man's technology (house or building) into the natural surroundings. To work toward a desirable landscape design, the landscape horticulturist must have a working knowledge of art elements and design principles.
    Elements of Art
    Elements of art include but are not limited to color, line, form, texture and scale. These elements are never independent of each other, but we will discuss their individual natures before considering the interactions.
    Color
    Color variation can best be explained by use of a color wheel. Primary colors are red, blue and yellow. Orange, green and violet are called secondary colors because they are combinations of two primary colors. For example, yellow and red are combined to yield orange. Tertiary colors are the fusion of one primary and one secondary color. These colors would be between primary and secondary colors.
    Tint refers to a light value and is accomplished by adding white to the pure color on the color wheel, while shade is a dark value and is created by adding black to the pure color on the color wheel. Black, white and grey are neutrals and are compatible with any color. Light colors and tints tend to attract attention, as do bright, vivid colors.
    Colors are combined into color schemes for practical applications. Three basic color schemes are monochromatic, analogous and complementary. A monochromatic color scheme consists of different tints and shades of one color and is seldom achieved in its pure form in the landscape. An example of an incomplete monochromatic color scheme would include white and pink flowers with a background of a dark pink and red brick house.
    Analogous color schemes combine colors, which are adjacent or side-by-side on the color wheel. An analogous color scheme could include green, blue-green, green-blue, blue and violet blue. This color scheme could be achieved by varying the foliage color from green to blue-green or by using pyracantha with orange-red berries against a red brick house.
    Complementary color schemes combine colors directly across the color wheel. For example, red and green would be complementary colors. A complementary color scheme may be achieved by using plants with green foliage against a red brick house.
    It is possible to have varying color schemes in one area of the landscape as the seasons change. White and pink azaleas flowers can yield a monochromatic color scheme with a red brick house. The green azalea foliage would produce a complementary color for the red brick during the summer. Pyracantha berries would be an analogous color to the red brick in the fall. The landscape designer should consider the color changes throughout the year when developing a landscape plan.
    Colors can be used to visually change distance perspective. Warm colors and light tints like red, orange, yellow and white advance an object or area toward the observer. These colors and tints placed near the foundation of a house would make the house appear closer to the street. Cool colors and deep shades like blue, green and black recede and can be used to make the house appear farther from the street. Cool colors are restful while warm colors express action and are best used in filtered light or against a green or dark background.
    Color can be used to direct attention in the landscape. Due to this strong characteristic, color should be used carefully. When color is used for this purpose, consideration must be given to year-round color not just to seasonal color. Consideration may also be given to the time of day when this color will be enjoyed. White or light tints could be used to create interest on a patio. Dark colors would add little to family enjoyment of this area as the daylight hours passed.
    Line
    Line is related to eye movement or flow. The concept and creation of line depends upon the purpose of the design and existing patterns. In the overall landscape, line is inferred by bed arrangement and the way these beds fit or flow together. Line is also created vertically by changes in plant height and the height of tree and shrub canopies. Branching habits of plants, arrangement of leaves and/or sequence of plant materials create line in a small area such as an entrance or privacy garden.
    Straight lines tend to be forceful, structural and stable and direct the observer's eye to a point faster than curved lines. Curved or free-flowing lines are sometimes described as smooth, graceful or gentle and create a relaxing, progressive, moving and natural feeling.
    Form
    Form and line are closely related. Line is considered usually in terms of the outline or edge of objects, whereas form is more encompassing. The concept of form is related also to the size of an object or area. Form can be discussed in terms of individual plant growth habits or as the planting arrangement in a landscape.
    Plant forms include upright, oval, columnar, spreading, broad spreading, weeping, etc. Form is basically the shape and structure of a plant or mass of plants. Structures also have form and should be considered as such when designing the area around them.
    Texture
    Texture describes the surface quality of an object than can be seen or felt. Surfaces in the landscape includes buildings, walks, patios, groundcovers and plants. The texture of plants differs as the relationships between the leaves, twigs and branches differ . Coarse, medium or fine could be used to describe texture but so could smooth, rough, glossy or dull.
    Scale
    Scale refers to the size of an object or objects in relation to the surroundings. Size refers to definite measurements while scale describes the size relationship between adjacent objects. The size of plantings and buildings compared on the human scale must be considered.
    Principles of Design
    Color, line, form, texture and scale are tools ,which are used in combinations to adjust design principles. Design principles include unity, balance, transition, focalization, proportion, rhythm, repetition and simplicity. All these principles interact to yield the intended design.
    Unity is obtained by the effective use of components in a design to express a main idea through consistent style. Unity is emphasized by consistency of character between units in the landscape. Use of elements to express a specific theme within units creates harmony. Unity can be achieved by using mass planting and repetition.
    Unity means that all parts of the composition or landscape go together; they fit. A natural feeling evolves when each activity area belongs to and blends with the entire landscape. Everything selected for a landscape must complement the central scheme and must, above all, serve some functional purpose.
    Balance in design refers to the equilibrium or equality of visual attraction. Symmetrical balance is achieved when one side of the design is a mirror image of the other side. There is a distinct dividing line between the two sides. Equal lines, forms, textures or colors are on each side of a symmetrical design.
    Asymmetrical balance uses different forms, colors and textures to obtain balance of visual attraction. These opposing compositions on either side of the central axis create equal attraction. For example, mass may be opposed by color or linear dimension by height.
    The landscape designer must skillfully manipulate the design elements to create asymmetrical balance. The central axis must be predetermined and then developed by the elements of art and other principles of design discussed in this publication.
    Transition is gradual change. Transition in color can be illustrated by the radial sequence on the color wheel (monochromatic color scheme) previously discussed. Transition can be obtained by the arrangement of objects with varying textures, forms, or sizes in a logical sequential order. For example, coarse to medium to fine textures, round to oval to linear structural forms, or cylindrical to globular to prostrate plants. An unlimited number of schemes exist by combining elements of various size, form, texture and color to create transition. Remember, transition refers to the 3-dimensional perspective of composition, not just the flat or facial view.
    It is possible to use transition to extend visual dimensions beyond actual dimensions. For example, radical lines in the private area of the landscape can be used to enframe and/or focalize a lake scene. Transition of plant materials along these lines can make the scene become a part of the landscape. Transition from taller to shorter plants with textural changes from coarse to fine along focal lines emphasizes the beauty of a lake scene. Transition from shorter to taller plants and from fine to coarse textures would enframe the scene and make it appear closer, like a painting on a wall. Generally, transition assists in the gradual movement of a viewer's eye to the design and within it.
    Proportion refers to the size of parts of the design in relation to each other and to the design as a whole. One large towering oak may compliment an office building but would probably dwarf a single story residence . A three-foot pool would be lost in a large open lawn but would fit beautifully into a small private area. And of course, a colossal fountain would dominate a private garden but could enhance a large city plaza.
    Proportion in landscape design usually relates to people and their activities. The desired size relationships of components in a design should pose little problem for the designer who considers this principle routinely in systematic thought processes.

原文网址:http://www.pipcn.com/research/200906/12354.htm

也许您还喜欢阅读:

试谈滨水城的景观设计

浅谈如何搞好城市居住小区的园林规划

休闲社区景观设计六条原则

施工现场临时用电的五大原则

设备安装工程中质量监控的重要性研究

除险加固工程地质勘察的一般性原则

工程承包中合同的诚信原则的探讨

园林设计之于城市街道景观

项目范围管理的精益原则

我国机车信号信息标准化工作


【重要声明】本作品版权归建筑中文网和作者所有,允许以学习、研究之目的转载、复制和传播,但必须在明显位置注明原文出处和作者署名(请参考以下引文格式)且保证内容一致性,不得用于出售、出版、付费数据库或其它商业目的,本站保留追究一切法律责任的权利。投稿信箱
引用复制:网址 QQ/MSN 论文/著作 HTML代码

请告诉我们

请告诉我们您的知识需求以及对本站的评价与建议。
满意 不满意

Email: